Stuart Olson Dominion Construction, with Parkin, has been selected as the preferred design builder. The contract is for the final design and construction of two 30-bed inpatient units in the shelled-in space on the sixth and seventh floors of the Polson tower.
Construction is expected to start once initial planning meetings have occurred, and the work should be completed by the fall of 2015.