The level 5 slab has been cast and the topping off celebration was on June 1, 2016. The upper penthouse framing and steel framing continues for the north and south buildings. Concrete slabs for the level 2 penthouses to be poured in the next week with slab-on-grade to follow. Mechanical and electrical rough-in continues and
Read more